Euro Caps

 

Client
Euro Caps

Main Contractor
ADM

Architect
Creation Engineering Design Services

M&E Consultant
R&C
 

Contract Duration

16 weeks

 

Close co-operation, detailed programming and attention to detail made this project a success.

 

The brief

To re-configure and up-grade large sections of an existing pharmaceutical health care production facility and fit out a new build extension so as to double production capacity, at the same time as ensuring existing production was maintained throughout the contract.
To design and install state of the art mechanical and electrical installations to meet both the high standards and specific demands of a sophisticated pharmaceutical client.
 

The solution

Fast track construction, low maintenance systems were employed together with resin floors to achieve the clean room finishes. The use of extensive mezzanine structures allowed the installation of the large scale mechanical and electrical installations to progress without impacting on, or slowing down the building and refurbish- ment work within a very tight programme
 

The result

The provision of a high spec, low maintenance. clean room production facility incorporating a fully controlled environment M&E package that exceeded the clients expectations and allowed production goals to be met. Close co-operation and flexibility in approach allowed ADM to incorporate large scales changes within the agreed contract period.
 
Eurocaps Drying Tunnels
Eurocaps 1
Eurocaps Corridor
Eurocaps - Under Construction
Eurocaps - Under Construction 2